Complete Boat Structural Design & FEM
For the flagship of the successful Magellano series, the Verme Projects studio contributed with engineering intervention: boat structural design and FEM, outfitting design, systems and 3D piping. Belonging to the Low Emission Yacht family, she guarantees excellent performance in terms of sustainability thanks to the Dual Mode hull and to the Zero Emission Hotel Mode ...
For the flagship of the successful Magellano series, the Verme Projects studio contributed with engineering intervention: boat structural design and FEM, outfitting design, systems and 3D piping. Belonging to the Low Emission Yacht family, she guarantees excellent performance in terms of sustainability thanks to the Dual Mode hull and to the Zero Emission Hotel Mode ...
The Mangusta Oceano 39 is a new three-decker characterized by huge glazed surfaces, where supporting structures and bulwarks have, conversely, been minimized, so as to offer the closest possible contact with the sea. Developed and engineered by the shipyard together with designer Alberto Mancini and Studio Verme Projects for the engineering, harmoniously combines design and...
The Mangusta Oceano 39 is a new three-decker characterized by huge glazed surfaces, where supporting structures and bulwarks have, conversely, been minimized, so as to offer the closest possible contact with the sea. Developed and engineered by the shipyard together with designer Alberto Mancini and Studio Verme Projects for the engineering, harmoniously combines design and...
Over time we also gained Ferretti Group trust and esteem. Therefore in 2016 they task us to collaborate on the entire technical part development of the Navetta 42, the same as our clients did.  Hence, it is the first application of our “integration makes the difference” for Ferretti Group. To Navetta 42 was given the...
Over time we also gained Ferretti Group trust and esteem. Therefore in 2016 they task us to collaborate on the entire technical part development of the Navetta 42, the same as our clients did.  Hence, it is the first application of our “integration makes the difference” for Ferretti Group. To Navetta 42 was given the...
CL 120 has been the project which started our partnership with Ferretti Group.For the first time, a renowned worldwide building site relies on us for the design, in this specific case, of the hull and of the boat structure, and then gives us, working in progress, other engineering activities. Custom Line 120 was awarded at...
CL 120 has been the project which started our partnership with Ferretti Group.For the first time, a renowned worldwide building site relies on us for the design, in this specific case, of the hull and of the boat structure, and then gives us, working in progress, other engineering activities. Custom Line 120 was awarded at...

Verme Projects – Via Moggia 75/C – 16033 Lavagna (GE) – Italy / +39 0185 323037
VAT 01365960994

Verme Projects
Via Moggia 75/C
16033 Lavagna (GE) – Italy
+39 0185 323037
VAT 01365960994

Copyright 2021 – Massimo Verme – All right reserved
Privacy PolicyCookie Policy

Copyright 2021 – Massimo Verme
All right reserved
Privacy PolicyCookie Policy